ABC Metal Industry
#1Energy cost reduction
Load imbalance across 3 transformer substations and high harmonic levels (THD >12%) caused an extra 45,000 TL in monthly energy costs. Without per-device thresholds, all transformers were monitored with the same generic alarm.
Real-time transformer monitoring + per-device thresholds were configured with WattSkor. Yearly Analysis reports were presented monthly to executives. Reactive Q/P alarm fired before TEDAS penalty threshold was crossed.
Energy cost ↓
THD level ↓
Transformer efficiency
Payback period
“Thanks to WattSkor, we reduced transformer losses by 18%. We couldn't have achieved results this fast without per-device thresholds and reactive alarms.”
Ahmet Yılmaz
Plant Manager • ABC Metal Industry